About us
Focus on the existing and sustainable development problems of the industry, and provide solutions through technological innovation.
News
Learn about the latest company, products, business news and technological developments of SHEMAR POWER. Every day, SHEMAR is bringing safer and more economical electric energy closer to you.
Transmission
Substation
Distribution
CICA is assembled from insulators and replaces the original iron crossarms and suspension insulator strings with a horizontal layout. The end sections are directly connected to the conductors using suspension fittings, achieving a compact tower design structure. This effectively reduces accidents and losses caused by flashovers while providing mechanical support and electrical insulation for overhead conductor systems.
The 220kV Supporting Line Project from Zhuzhou Yuntian to Changsha Huaichuan in Zhuzhou, Hunan Province.
The Nuozaodu ±800kV Grounding Electrode Line Project in Yunnan
The Second 750kV Interconnection Project between Xinjiang and the Northwest Main Grid
The 750kV Transmission Project in Wujiaqu, Xinjiang
The 110kV Miceng Line in Urumqi, Xinjiang
The Ultra High Voltage Direct Current (UHVDC) ±800kV Lingzhou-Shaoxing Line ProjectThe 220kV Transmission Line Project from Jinhua Substation to Jichang Substation in Xinjiang
The Ultra High Voltage Direct Current (UHVDC) ±800kV Lingzhou-Shaoxing Line Project
The 220kV Maoqiang Line Renovation Project of Lianyungang Power Supply Company in 2009
The 500kV Technical Upgrade Project of Jiangsu Dongsan Line
The 220kV Transmission Project of Henan Nanyang Zhong 500kV Substation
TS Transco Hyderadad 132kV upgrade project
The 110kV Tianqing Line Project in Dali, Yunnan Province in 2019.
The 220kV Manxia I Phase Transmission Line Project in 2019
Click the button below to return to the page to download materials